Project math for the job site and the weekend warrior — concrete volumes, bag counts, and material estimates, with every formula shown so you always know why.
Extension Cord Gauge Chart: Pick the Right AWG Size
ESFI guidance by gauge and length — a 15 amp tool needs 14 AWG at 50 ft, 12 AWG at 100 ft, 10 AWG at 150 ft.
Open chart →ConstructionStandard Window Sizes Chart
A 36 by 48-inch window needs a 37 by 49-inch rough opening — every standard size with its rough opening and area.
Open chart →ConstructionStandard Door Sizes Chart
A 34 by 82.5-inch rough opening takes a 32 by 80-inch door — every standard size with its rough opening, finished size and thickness.
Open chart →ConstructionKitchen Cabinet Sizes Chart
Base cabinets 34.5 in high and 24 in deep, wall cabinets 12 in deep, tall pantry 84, 90, or 96 in — full printable tables plus a run-length calculator.
Open calculator →ConstructionMulch Coverage Chart: Cubic Yards & Bags
Areas 100 to 1,000 sq ft at 2, 3, and 4 inches deep: 500 sq ft at 3 inches needs 4.63 cubic yards — 63 bags of 2 cubic feet.
Open calculator →ConstructionCopper Pipe Size Chart & Volume Calculator
Nominal sizes 3/8 to 2 inches with Type L inside diameters: 100 feet of 3/4-inch pipe holds 2.51 gallons — volume for any size and length.
Open calculator →ConstructionShingle Coverage Chart & Calculator
A 1,800 sq ft roof is 18 squares and 54 bundles before waste — 60 to buy at 10% waste. Chart and calculator for any roof size.
Open calculator →ConstructionRoof Shingle Chart: 3-Tab vs Architectural by Roof Size
A 1,800 sq ft roof needs 18 squares — 54 bundles, 60 with 10% waste — 1,620 three-tab shingles and 5,760 nails. 3-tab vs architectural by roof size — free.
Open calculator →ConstructionDoor Size Chart & Rough Opening Calculator
A 36 by 80 inch door needs a 38 by 82.5 inch rough opening: standard sizes charted, any door size calculated.
Open calculator →ConstructionGutter Size Chart: 5-Inch vs 6-Inch K-Style & Downspouts
A 1,200 sq ft roof section at pitch factor 1.1 needs a 6-inch K-style gutter with 3x4 downspouts: HUD-basis sizing charted, any roof section calculated.
Open calculator →ConstructionBrick Size Chart & Wall Calculator
Modular, standard, queen, king, utility and Norman sizes charted: a 10 by 8 foot wall needs 540 bricks exactly, 567 to buy with 5% waste.
Open calculator →ConstructionBrick Coverage Chart: Bricks and Mortar per Square Foot
A 100 sq ft modular-brick wall needs 675 bricks (743 with waste) and 19 bags of mortar. Bricks per sq ft and mortar bags — free.
Open calculator →ConstructionFence Picket Chart & Calculator 2026
Pickets per 10 feet for 4, 5.5, 6 and 8-inch pickets at 0, 0.5 and 1-inch gaps: a 100-foot fence with 6-inch pickets at a half-inch gap needs 185 pickets exactly, 195 to buy with 5% waste, plus 14 posts.
Open calculator → ConstructionConcrete Block Size Chart & Calculator
A 10 by 8 foot wall needs 95 blocks with waste: nominal vs actual sizes, weights, and coverage for 4, 6, 8, and 12-inch block.
Open calculator →ConstructionConcrete Block Chart: Coverage, Waste & Mortar Bags
A 100 sq ft wall needs 112.50 standard blocks, 124 with 10% waste, and 11 bags of 80-lb mortar. Coverage by wall area and block width — free.
Open calculator → ConstructionStud Spacing Chart & Stud Calculator
10 ft wall at 16 in on-center: 8 studs, buy 9 with waste — full 16-in vs 24-in chart for 8–20 ft walls.
Open chart → ConstructionWood Screw Size Chart & Pilot Hole Guide
#8 in softwood: 7/64 in pilot, 11/64 in clearance — gauges #6–#14 with softwood and hardwood pilots.
Open calculator → ConstructionDrill bit size chart
Fraction ↔ decimal ↔ mm, 37 sizes, printable.
Open chart →ConstructionSaw Blade Size Chart: Diameter, Arbor & Teeth by Saw Type
Circular saw blades from 4-1/2 to 14 inches: diameter, arbor size, depth of cut and tooth counts by saw type and material. Free printable reference chart.
Open calculator →ConstructionRoof pitch chart
Pitch to angle, slope, rafter factor — printable chart.
Open chart →ConstructionWire gauge chart
Every AWG size 40 to 4/0: diameter, area, resistance.
Open chart →ConstructionConcrete tube
Bags and yards for round tubes, piers, and footings.
Open calculator →ConstructionRamp vs porch lift
Side-by-side cost and space comparison for any rise.
Open comparison →ConstructionRamp slope calculator
Size an ADA ramp: run length, grade, and the 1:12 table.
Open calculator →ConcreteConcrete
Cubic yards and 60/80-lb bag counts for slabs and tubes.
Open calculator →ConstructionInches to fraction
Decimal inches to the nearest 16th, 32nd, or 64th — plus full lookup charts.
Open calculator →ConstructionLumber dimensions chart
Nominal vs actual sizes — a 2×4 is really 1.5 × 3.5 in. Printable chart.
Open chart →ConstructionWire gauge ampacity chart
NEC Table 310.16 ampacity + max breakers, with 3 live lookups.
Open chart →ConstructionPaint coverage chart
How many gallons per room, with 3 live calculators.
Open chart →ConstructionSandpaper grit chart
Every grit, micron size, and best use — with 3 live lookups.
Open chart →ConstructionConcrete slab calculator
Slab yards, 40/60/80-lb bag counts, and ready-mix cost.
Open calculator → ConstructionTap drill chart
Correct 75%-thread tap drill for every UNC screw (#0–1") and metric screw (M3–M16) — pick a screw, get the drill; or enter a drill and see which screws it fits.
Open chart →ConstructionUS rebar size chart
Every US rebar size #3–#18 with diameter, area and weight per foot from ASTM A615: a #4 bar is 0.500 in and 0.668 lb/ft, so a 20-ft stick weighs 13.36 lb. Look up any size with metric equivalents.
Open chart →ConstructionPVC pipe size chart
Every Schedule 40 & 80 PVC size from 1/2″ to 4″ with OD, ID, wall and weight per foot — a 2″ Sch 40 pipe is 2.375″ OD with a 2.067″ ID. Pick a size and length for total weight.
Open chart →ConstructionBolt size chart
SAE and metric bolt sizes with thread pitch, tap drill and wrench size: 1/2"-13 UNC takes a 27/64" tap and a 3/4" wrench. Live lookup plus printable tables.
Open chart →ConstructionDeck joist span chart
Code-table max spans for deck joists: a 2×8 Southern Pine joist at 16″ OC spans 11′-10″ — 10′-1″ with a cantilever. Three species groups, printable.
Open chart →ConstructionDeck Screw Chart: Sizes, Lengths & Screw Calculator
Deck screw chart: 2-1/2 in screws for 5/4 decking, 3 in for 2x boards — a 20 x 16 ft deck needs 1,120 screws in 3 boxes. Plus a free calculator for your deck.
Open calculator →ConstructionDeck Screw Spacing Chart: Screws per Board & 100 Sq Ft
A 16×12 ft deck on 16-inch joists needs 700 screws — 20 per board, 364.58 per 100 sq ft. Spacing by joist and board size — free.
Open calculator →ConstructionConcrete mix ratio chart
Nominal mixes M5–M25 with MPa/psi strengths and water–cement guidance, plus a pour calculator: 1 yd³ of M20 needs about 5.9 bags of cement. Printable.
Open chart → ConstructionStair Riser & Tread Chart
IRC 2021 limits (7-3/4" max riser, 10" min tread) with a rise-to-riser calculator. 105" total rise → 14 risers at 7 1/2", 130" run. Printable reference table.
Open chart → constructionConstruction
AWG Wire Ampacity Chart
awg wire ampacity chart nec 310.16 copper aluminum. → ConstructionNPT Pipe Thread Chart
Full NPT chart, 1/16" to 4": OD, TPI, pitch, and tap drill for all 14 sizes, plus a size lookup. 1/2" NPT is 0.840" OD at 14 TPI. Printable.
Open chart →ConstructionBolt Torque Chart
Dry-thread torque for SAE Grades 2, 5, 8 (1/4 inch to 1 inch) and metric Classes 8.8, 10.9 (M6 to M24), plus a lookup with N·m conversion. 1/2 inch Grade 5 is 75 ft-lb. Printable.
Open chart →ConstructionLumber Size Chart
A 2×4 is really 1.5×3.5 inches. Full nominal-to-actual table for 1×2 through 6×6, plus a board-foot calculator and cross-section areas.
Open chart →ConstructionSheet Metal Gauge Chart
Steel and aluminum gauge thicknesses 7–30, in inches and millimetres, with a lookup for weight per square foot. Printable.
Open tool →ConstructionStandard Door Sizes Chart
Interior, exterior, double, French and patio sizes plus rough openings — 36×80 needs 38×82.5 in.
Open calculator →ConstructionPlywood Thickness Chart
Nominal vs actual thickness for 1/4 to 1-1/8 in plywood — 3/4 in is really 23/32 in (0.719 in, 18.26 mm) — plus typical 4×8 sheet weights and a sheets-needed calculator.
Open chart →ConstructionWrench Size Chart
The hex-head wrench for every common SAE and metric bolt — a 3/8 in bolt takes a 9/16 in wrench (14.29 mm); M10 takes 16 mm, with the 16/17, 18/19 and 21/22 mm variations flagged.
Open chart →ConstructionDrywall Sizes Chart
1/4 to 5/8 in thicknesses, 4×8/4×10/4×12 sheets — 400 sq ft at 10% waste needs 14 sheets of 4×8, about 756 lb.
Open chart → ConstructionInsulation R-Value Chart & Calculator
Fiberglass, cellulose, spray foam and rigid board R-values per inch, plus the inches needed for R-38 or R-49 — 11.9 in of fiberglass batts from R-11 to R-49.
Open chart → ConstructionTile Size Chart & Coverage Calculator
8 common tile sizes with square feet per tile, plus tiles and boxes needed for any room — 100 sq ft in 12×24 tiles needs 55 tiles, 6 boxes.
Open chart →ConstructionBaluster Spacing Chart & Calculator
96 inches of rail with 1.5-inch balusters takes 17 balusters at a 3.92-inch clear gap — every length and width under the 4-inch rule.
Open chart →ConstructionConcrete Mix Calculator: Cement, Sand & Gravel by Ratio
A 10×10 ft slab at 4 in, 1:2:4 mix, needs 8 bags of cement, 30 of sand, 47 of gravel and 41.33 gallons of water — enter your size and ratio to get yours.
Open calculator →ConstructionWater Heater Size Chart
A 4-person household with a 40-gallon peak hour needs a 40-gallon tank — look up any household size, reverse from a target first-hour rating, and see why electric tanks size up a step.
Open chart →ConstructionConcrete Footing Calculator: Volume, Bags & Yardage
A 40 ft × 18 in × 12 in footing needs 60.0 ft³ (2.22 yd³) — 134 sixty-pound bags or 100 eighty-pound bags. Any size, plus piers.
Open calculator →ConstructionDeck Board Spacing Chart: Gaps, Coverage & Boards
A 12 ft × 10 ft deck needs 250.43 lineal feet of 5.5-inch board at a 1/4-inch gap — 21 boards and 420 screws. Gaps by material, coverage tables, and a live lookup.
Open chart →ConstructionConcrete Driveway Calculator: Yards, Bags & Cost
A 20 ft × 12 ft driveway at 4 inches needs 2.96 cubic yards — 134 eighty-pound bags or $444.44 of ready-mix. Any size, plus waste and thickness.
Open calculator →ConstructionGrout Coverage Calculator: How Many Bags Per Sq Ft
100 sq ft of 12×12 tile with 1/8 in joints needs 7.81 lb of grout — one 25-lb bag. A 2×2 mosaic gets only 53 sq ft from the same bag; 24×24 tile stretches it to 640.
Open chart →ConstructionConcrete Steps Calculator: Volume, Bags & Cost Compared
Four 7 in × 11 in steps, 48 in wide, need 26.28 cubic feet — 0.97 cubic yards, 59 sixty-pound bags or $145.99 of ready-mix against $265.50 of bags.
Open calculator →ConstructionFurnace Filter Size Chart: Actual Sizes, Area & MERV Guide
A 16×25×1 filter is really 15.5×24.5×0.75 in with 400 sq in of face area. Every standard size, actual size, MERV rating, and replacement interval in one chart.
Open chart →ConstructionConcrete Reinforcing Mesh Calculator: Sheets, Weight & Cost
A 20×12 ft slab needs 2 sheets of 6×6 W1.4 mesh weighing 67.2 lb at $96.00. Sheets, rolls, weights and cost for any slab, mesh type, or price.
Open calculator →ConstructionPipe Size Chart: Nominal Size, OD, ID & Flow (Sch 40/80)
1-inch Schedule 40 pipe is 1.315 in outside, 1.049 in inside, and carries 13.47 GPM at 5 ft/s — all 14 sizes, both schedules, plus a reverse flow lookup.
Open chart →ConstructionHeat Pump vs Furnace Calculator: Which Costs Less?
Heating a 60 MMBtu home costs $714 a year with a heat pump vs $1,263 with gas. Payback is 9.11 years — the heat pump wins by $3,232 over 15 years.
Open comparison →ConstructionQuartz vs Granite Countertops: 10-Year Cost Calculator
A 40 sq ft kitchen costs $3,400 in quartz vs $2,800 in granite — but granite needs resealing. Quartz wins by $400 over 10 years.
Open comparison →ConstructionTankless vs Tank Water Heater Cost Calculator 2026
A gas tank costs $340.94 a year vs $215.33 tankless — but tankless costs $2,300 more to install. See the 10, 15 and 20-year totals.
Open comparison →ConstructionWood vs Gas Fireplace: Annual Heating Cost Calculator
Wood costs $680.77 a year vs $575.00 for gas at 25 MMBtu of heat — but below $195 a cord, wood wins. Compare annual, 10-year and break-even costs.
Open comparison →ConstructionCarpet Cost Calculator: Price Per Room & Install 2026
A 12×10 ft room needs 132 sq ft with waste — $871.20 all-in. Price any room with carpet, padding and install.
Open calculator →ConstructionBathtub Size Chart: Standard Tub Dimensions & Fit Guide
Standard tubs run 48×28 to 72×42 inches — the 60×30 alcove is the most common. Check whether a tub fits your bathroom.
Open chart →ConstructionHardwood vs Laminate Flooring: 25-Year Cost Calculator
Hardwood costs $12,000 upfront vs $5,000 for laminate on 1,000 sq ft — but after resale, hardwood wins the 25-year total by $1,000. Compare upfront, gross and net costs.
Open comparison →ConstructionGenerator Size Chart: What Size Generator Do I Need?
A fridge needs 700 running watts but 2,200 to start — 2,500 running watts plus a 2,200-watt start needs a 5,000-watt generator. Size yours from the chart.
Open chart →ConstructionPaint Cost Calculator: Price Per Room & Gallon 2026
A 12×10 ft room with 8 ft ceilings needs 2 gallons and costs $125.00 all-in for two coats. Price any room by the gallon.
Open calculator →ConstructionVinyl Plank vs Laminate Flooring: 25-Year Cost Calculator
Vinyl costs $7,000 upfront vs $5,000 for laminate on 1,000 sq ft — but laminate needs a $5,000 replacement at year 15, so vinyl wins the 25-year net total by $5,000. Compare upfront, gross and net costs.
Open comparison →ConstructionTile Cost Calculator: Price Per Room & Install 2026
A 12×10 ft room needs 132 sq ft of tile with 10% waste and costs $1,551.00 all-in — $660.00 tile, $99.00 grout and thinset, $792.00 labor. Price any room.
Open calculator →ConstructionCarpet vs Hardwood Flooring: 25-Year Cost Calculator
Carpet costs $5,000 upfront vs $12,000 for hardwood on 1,000 sq ft — but carpet needs two replacements, so hardwood wins the 25-year net total by $6,000. Compare upfront, gross and net costs.
Open comparison →ConstructionFence Cost Calculator: Price Per Foot & Install 2026
A 150 ft wood fence costs $4,750.00 all-in — $4,500.00 for the run plus a $250.00 gate, $31.67 a foot. Price any fence or check a budget.
Open calculator →ConstructionDeck vs Patio Cost Calculator — 25-Year
A 400 sq ft wood deck costs $14,000 upfront vs $7,200 for a concrete patio — and the deck needs replacing once, so the patio wins the 25-year net total by $17,800. Compare upfront, gross and net costs.
Open comparison →ConstructionConcrete Cost Calculator: Price Per Yard & Pour 2026
A 10×12 ft, 4-inch slab needs 1.63 cubic yards — $244.50 of concrete plus $75.00 delivery, $319.50 all-in. Price any pour or check a budget.
Open calculator →ConstructionSod vs Grass Seed Cost Calculator
A 5,000 sq ft lawn costs $5,000 in sod upfront vs $750 in seed — and seed wins the 25-year net total by $5,000. Compare upfront, gross and net costs.
Open comparison →ConstructionCeiling Fan Size Chart by Room Size
A 12×15 ft room (180 sq ft) takes a 44–50 in fan with a 6-in downrod on a 9 ft ceiling. Find the right blade span and downrod for any room.
Open chart →ConstructionMulch Cost Calculator: Yards & Bags 2026
A 500 sq ft bed, 3 inches deep, needs 5.09 cubic yards — $229.17 of mulch plus $50.00 delivery, $279.17 all-in. Price any bed or check a budget.
Open calculator →ConstructionGravel vs Mulch Landscaping: 25-Year Cost Calculator
A 1,000 sq ft yard costs $1,200 in gravel upfront vs $600 in mulch — and gravel wins the 25-year net total by $7,100. Compare upfront, gross and net costs.
Open comparison →ConstructionGravel Cost Calculator: Price Per Yard & Project 2026
A 500 sq ft bed, 3 inches deep, needs 5.09 cubic yards — $254.63 of gravel plus $50.00 delivery, $304.63 all-in. Price any job or check a budget.
Open calculator → ConstructionConcrete vs Asphalt Driveway Cost: 25-Year Compare
A 600 sq ft driveway: concrete $7,200 upfront vs asphalt $4,200 — but asphalt is replaced once, so concrete wins the 25-year net by $3,700.
Open comparison → ConstructionSod Cost Calculator: Price Per Sq Ft & Install 2026
A 5,000 sq ft lawn needs 5,500 sq ft of sod — $5,500.00 plus $75.00 delivery, $5,575.00 all-in, 11 pallets. Price any lawn or check a budget.
Open calculator → ConstructionAsphalt Shingle vs Metal Roof Cost: 25-Year Compare
A 2,000 sq ft roof costs $10,000 in shingles or $24,000 in metal — shingles win upfront by $14,000, but metal wins the 25-year net by $4,000. Compare both over 25 years.
Open calculator → ConstructionLadder Height Chart: What Size Ladder Do I Need?
Need to reach 12 ft? An 8-ft step ladder does it. Pick the smallest safe ladder for any height, from 4-ft step ladders to 28-ft extension ladders.
Open calculator → ConstructionLadder Size Chart: Heights, Reach & Weight Ratings
A 16-ft extension ladder reaches 12.5 ft — pick the right step, extension, multi-position or telescoping ladder for the job, with duty ratings and the 1-in-4 base rule.
Open chart → ConstructionDrywall Size Chart: Sheet Sizes, Thickness & Weight 2026
A 4×8 sheet of 1/2-inch drywall weighs 52 pounds and covers 32 square feet — pick the right thickness and sheet size, with weights and a sheets-needed calculator.
Open chart → ConstructionPropane Tank Size Chart: Gallons, BTU, Weight & Runtime 2026
A 20-lb propane tank holds 4.6 gallons and 420,909 BTU — about 14.03 hours on a 30,000 BTU grill. Compare every tank from 20 lb to 1,000 gallons.
Open chart → ConstructionSeed Spacing Chart: How Far Apart to Plant Vegetables
Carrots go 2 inches apart in rows 12 inches apart — a 10-foot row holds 61 plants. Spacing, depth and sprout times for 12 vegetables, plus a row planner.
Open chart → ConstructionFirewood Cord Chart: Cords, Face Cords & BTUs by Species
One face cord of red oak is 42.67 cubic feet — 0.33 cords, 8.20 million BTU, $83.33 at $250 a cord. Twelve species, stack sizes and costs.
Open chart → ConstructionGravel Coverage Chart: Cubic Yards, Tons & Cost by Area
200 sq ft at 3 inches deep needs 1.85 cubic yards of gravel — 2.69 tons, $101.85 at $55 a yard. Six gravel types, depths, and costs.
Open chart → ConstructionTile Coverage Chart: How Many Tiles, Boxes & Cost by Area
100 sq ft at 10% waste needs 110 tiles of 12×12 — 11 boxes, $275.00 at $2.50 a tile. Six tile sizes, waste rates, and costs.
Open chart → ConstructionDrywall Sheet Chart: How Many Sheets, Waste & Cost by Area
400 sq ft at 10% waste needs 14 sheets of 4×8 drywall — $182.00 at $13 a sheet. Three sheet sizes, waste rates, and costs.
Open chart → ConstructionBuy vs Lease Solar Panels Calculator: Which Saves More?
Buying a $23,000.00 solar system costs $26,750.00 over 25 years; leasing at $150.00 a month with a 2.9% escalator costs $64,771.81 — buying wins by $38,021.81.
Open calculator → ConstructionDIY vs Hire a Plumber Calculator: Which Costs Less?
A plumber at $125.00 an hour for 4 hours plus $200.00 of parts at 25% markup costs $750.00; doing it yourself costs $430.00 — DIY wins by $320.00.
Open calculator → ConstructionTopsoil Cost Calculator: Price Per Yard & Project 2026
500 sq ft at 3 in deep needs 5.09 cubic yards of topsoil — $203.70 plus $50.00 delivery, $253.70 all-in. Price any bed or check a budget.
Open calculator → ConstructionPaver Patio vs Concrete Patio: 25-Year Cost Compare
A 400 sq ft patio costs $8,800 in pavers or $4,000 in concrete — concrete wins upfront by $4,800, but pavers win the 25-year net by $1,200. Compare both over 25 years.
Open calculator → ConstructionPaver Patio Cost Calculator: Price Per Sq Ft & Install 2026
400 sq ft needs 440 pavers and 5.43 cu yd of base gravel — $5,280 of pavers plus $3,200 of labour and $75 delivery, $8,826.60 all-in. Price any patio or check a budget.
Open calculator → ConstructionWood Fence vs Vinyl Fence: 25-Year Cost Calculator
A 150 ft fence costs $4,500 in wood or $6,750 in vinyl — wood wins upfront by $2,250, but vinyl wins the 25-year net by $3,250. Compare both over 25 years.
Open calculator → ConstructionSocket Size Chart: What Size Socket for Each Bolt?
An M12 bolt takes an 18 mm socket — 0.71 in across the flats. Find the right socket for any metric bolt, M6 to M20.
Open chart → ConstructionDeck Cost Calculator: Price Per Sq Ft & Install 2026
A 20 × 20 ft deck needs 440 sq ft of decking — $15,400 of decking plus a $250 permit, $15,650 all-in. Price any deck or check a budget.
Open calculator → ConstructionSolid Hardwood vs Engineered Hardwood: 25-Year Cost
A 1,000 sq ft floor costs $12,000 in solid hardwood or $9,000 in engineered — engineered wins upfront by $3,000, but solid wins the 25-year net by $8,000. Compare both over 25 years.
Open calculator → ConstructionAllen Key Size Chart: What Size Key for Each Bolt?
An M8 bolt takes a 6 mm Allen key — 0.24 in across the flats. Find the right Allen key for any metric bolt, M3 to M24.
Open chart → ConstructionRetaining Wall Cost Calculator: Price Per Sq Ft 2026
A 30 × 4 ft wall needs 132 sq ft of blocks — $3,300 of blocks plus $150 gravel and $75 delivery, $3,525 all-in. Price any wall or check a budget.
Open calculator → ConstructionPaint Brush Size Chart: Pick the Right Brush Width
A 7.5-inch surface takes a 2.5-inch brush — 64 mm across. Match any surface to the right brush width, from 1-inch detail work to 4-inch walls.
Open chart → ConstructionPergola Cost Calculator: Price Per Sq Ft & Install 2026
A 12 × 12 ft pergola costs $6,480.00 to build plus $300.00 in footings — $6,780.00 all-in, $47.08 a square foot. Price any size or check a budget.
Open calculator → ConstructionBuild vs Buy a House: 25-Year Cost Calculator 2026
Build a new home for $430,000 or buy one for $400,000 — building wins the 25-year net by $50,000.00 once resale is counted. See the upfront, gross and net winners, the break-even build price, and every branch.
Open calculator → ConstructionAir Filter Size Chart: What Size Filter Do I Need?
A 20 by 25 in filter is 19.5 by 24.5 in actual size — 49.5 by 62.2 cm. Look up any standard filter size, nominal to actual, or work backwards from the size printed on your old filter.
Open chart → ConstructionShed Cost Calculator: Price Per Sq Ft & Install 2026
A 10 by 12 ft shed costs $5,730.00 to build — $5,280.00 of structure plus $300.00 for the foundation and $150.00 for delivery, $47.75 a square foot all-in. Price any size or check a budget.
Open calculator → ConstructionCurtain Rod Size Chart: Length, Diameter & Brackets 2026
A 36 in window needs a 46 in rod — 117 cm, 1 in diameter, on 2 brackets. Look up any window width, or work backwards from a rod you already own.
Open chart → ConstructionGazebo Cost Calculator: Price Per Sq Ft & Install 2026
A 12 by 12 ft gazebo costs $7,780.00 to build — $6,480.00 of structure plus $500.00 for the foundation and $800.00 for assembly, $54.03 a square foot all-in. Price any size or check a budget.
Open calculator → ConstructionExtension Cord Size Chart: Gauge by Length & Amps 2026
A 50 ft cord at 12 amps needs 16 AWG — longer runs need thicker wire. Look up the right gauge for any length and tool, or work backwards from a cord you already own.
Open chart → ConstructionDriveway Cost Calculator: Price Per Sq Ft & Install 2026
A 24 by 12 ft driveway costs $2,854.00 — $2,304.00 of paving plus $400.00 for base prep and $150.00 for sealing, $9.91 a square foot all-in. Price any size or check a budget.
Open calculator → ConstructionChainsaw Bar Size Chart: Pick the Right Bar Length
A 14 in trunk needs a 16 in bar (41 cm) — the bar should run 2 in longer than the trunk. Look up the right bar for any tree, or work backwards from a bar you already own.
Open chart → ConstructionAsphalt Calculator: Tons & Cost for Driveways 2026
A 24 by 12 ft driveway at 3 in deep needs 5.74 tons of asphalt and costs $706.62 — $631.62 of material plus $75.00 delivery, $2.45 a square foot all-in. Price any size or check a budget.
Open calculator → ConstructionDrywall Cost Calculator: Sheets & Price Per Room 2026
A 12 by 10 ft room costs $721.85 to drywall — 301 sq ft of net wall, 11 sheets at $15.00 each, $105.35 of supplies and $451.50 of labour, $2.40 per sq ft. Price any room or check a budget.
Open calculator →ConstructionDrywall Mud Chart: Joint Compound by Coat & Bucket
12 sheets of 4×8 drywall need 3.84 gallons of joint compound across 3 coats — one 4.5-gallon bucket. Mud per sheet, per coat, and bucket count — free.
Open calculator → ConstructionInsulation Cost Calculator: Price Per Sq Ft & Install 2026
A 1,000 sq ft attic costs $2,200.00 to insulate — 1,100 sq ft billable at $1.20 of materials and $0.80 of labour per sq ft, $2.20 per sq ft all-in. Price any attic or check a budget.
Open calculator → ConstructionPlywood Size Chart: Sheet Sizes, Thickness & Weight
A 4×8 sheet of 3/4 in plywood weighs 70.00 lb — seven thicknesses from 1/4 in to 1 in with weights, sheet sizes and common uses. Look up any sheet.
Open chart → ConstructionMetal Roof Cost Calculator: Price Per Sq Ft & Install 2026
A 40×30 ft metal roof costs $20,934.00 — 1,380.00 sq ft at $15.17 a square foot, materials $13,662.00 plus labour $6,072.00. Price your own roof.
Open calculator → ConstructionStud Size Chart: Standard Studs, Spacing & Count 2026
A 12 ft wall at 16 in on-center needs 10 studs — six nominal sizes from 2×3 to 2×12 with actual dimensions, spacing and stud counts. Look up any wall.
Open chart → ConstructionFence Stain Calculator: Gallons & Cost Per Foot 2026
A 150 ft fence costs $594.00 to stain — 13.20 billable gallons, $3.96 a linear foot. Price your own fence.
Open calculator → ConstructionBlind Size Chart: What Size Blinds for My Window? 2026
A 36 in window takes a 35.5 in blind inside mount — 90.17 cm — with 2 brackets. Look up any window, inside or outside mount.
Open chart → ConstructionCentral AC vs Window AC: 10-Year Cost Calculator 2026
Window units cost $7,920.00 over 10 years against $12,090.00 for central AC — a $4,170.00 saving. Compare your hours, power price and install cost.
Open calculator → ConstructionDoor Header Size Chart: Span, Load & Lumber Sizes 2026
A 36 in opening takes a doubled 2×6 header — 5.50 in deep. Look up any span from 24 to 96 in, with jack and king studs.
Open chart → ConstructionChicken Coop Size Chart: Space Per Hen & Run Guide 2026
6 standard hens need 24 sq ft indoors, a 60 sq ft run, 2 nest boxes and 5 ft of roost — look up any flock from 2 to 24 hens, or work backwards from the space you have.
Open chart →ConstructionNut Size Chart: Wrench Size & Tap Drill
A 3/8-16 hex nut takes a 9/16 in wrench — 14.29 mm — with a 5/16 in tap drill. Look up every size from 1/4-20 to 1-8, or work backwards from the wrench you have.
Open chart → ConstructionWasher Size Chart: What Size Washer Do I Need? 2026
A 4.5 cu ft washer holds 18 lb and suits 4–5 people. Look up any drum from 2.0 to 6.0 cu ft, with load and width.
Open chart → ConstructionFurnace Size Calculator: BTU by Sq Ft & Climate 2026
A 2,000 sq ft home in Zone 3 needs 100,000 BTU/h — a 125,000 BTU furnace, $5,625 installed. Size yours by sq ft and climate.
Open calculator → ConstructionWindow Size Chart: Standard Window Sizes & Dimensions
A 36x48 in window is 91.44x121.92 cm and 12.00 sq ft — look up any of the 9 standard sizes, or work backwards from the area you have.
Open chart → ConstructionBoiler Size Calculator: BTU by Sq Ft & Climate 2026
A 2,000 sq ft home in Zone 3 needs 100,000 BTU/h of heat — a 117,647.06 BTU boiler, 125,000 standard size, $6,470.59 installed. Size yours by zone, ceilings and insulation.
Open calculator → ConstructionPropane vs Electric Heater: Heating Cost Calculator 2026
Heating 10,000,000 BTU a month costs $409.84 with propane against $498.24 electric — propane wins by $442.03 a season. Propane has to reach $3.65 a gallon before electric wins.
Open calculator → ConstructionNail Size Chart: Penny Sizes, Lengths & Gauges 2026
An 8d common nail is 2.5 in long, 10.25 gauge and 0.131 in across — look up any of the 16 standard penny sizes from 2d to 60d, or work backwards from a length.
Open chart → ConstructionConcrete Bag Chart: Bags Per Slab & Cubic Yard 2026
A 10×10 ft slab 4 in thick needs 62 × 80-lb bags ($341.00) — look up 40, 50, 60 and 80-lb bags per slab or per cubic yard, or work backwards from a budget.
Open chart → ConstructionPaint Roller Size Chart: Sizes, Nap & Coverage 2026
A 12×12 ft room needs 1.21 gallons (buy 2 cans, $90.00) — look up 4, 6, 9, 12 and 18-in rollers and nap lengths for smooth to rough walls, or work backwards from a budget.
Open chart → ConstructionConcrete Driveway Cost Calculator: Price Per Sq Ft 2026
A 20×20 ft driveway costs $3,214.81 ($8.04/sq ft) — 5.43 cubic yards with waste, or 245 bags of 80-lb mix. Price yours by size and thickness.
Open calculator → ConstructionBoard Foot Calculator: Lumber Board Feet & Cost 2026
Ten 2x6 boards at 8 ft are 80.00 board feet for $360.00 — $36.00 a board. Work out any lumber size, and what a budget buys.
Open calculator →ConstructionLumber Board Feet Chart: Board Feet by Size & Length
A 2x6 board 8 ft long is 8.00 board feet, $9.60 at $1.20 per board foot. Board feet by size and length, plus cost — free.
Open calculator →ConstructionLumber Weight Chart: Pounds per Board Foot & Calculator
How much does lumber weigh? Real air-dry weights for 10 species — white pine 2.08 lb to white oak 4.00 lb per board foot — plus a board-feet calculator. 100 board feet of Douglas fir weighs 283.33 lb. Free.
Open calculator →ConstructionRoofing Nail Chart: Length, Size & Nails per Square
Roofing nail chart: 1-1/4 in nails on 3/8 in decks, 1-3/4 in for re-roofs, 320 nails a square — plus a free calculator for total nails, boxes and weight.
Open calculator → ConstructionPaver Size Chart: How Many Pavers Per Sq Ft & Cost 2026
A 200 sq ft patio needs 534 pavers of 6x9 (587 with waste) for $1,467.50 — 2.67 pavers per square foot. Every standard size from 4x8 to 12x24.
Open calculator → ConstructionDuct Size Chart: CFM to Duct Diameter & Size Guide
A 400 CFM system needs a 12 in round duct (550 CFM capacity, 10×12 in rectangular) at 509 FPM — every size from 5 in to 20 in, 95 to 1,527 CFM.
Open calculator → ConstructionFence Post Size Chart: Depth, Length & Concrete Guide
A 6 ft fence needs 4×4 posts, 9 ft long, set 30 in deep in 12 in holes — 3 bags of concrete per post. Every height from 3 ft to 8 ft, with post sizes, spacing and bag counts.
Open calculator → ConstructionDeck Board Size Chart: Width, Spacing & Board Count
A 12 ft by 16 ft deck takes 26 boards of 5/4×6 — 416 linear feet, $1,040.00 at $2.50 a foot. Every board size from 1×4 to 2×12, with spacing and board counts.
Open calculator → ConstructionShingle Size Chart: Bundles, Squares & Roof Coverage Guide
An 1,800 sq ft roof at 10% waste needs 60 bundles — 19.80 squares, $2,100.00 at $35 a bundle. Every shingle size from 3-tab to luxury, with bundle counts.
Open calculator → ConstructionCabinet Size Chart: Standard Kitchen Cabinet Sizes 2026
Six 24-inch cabinets fit a 12-foot wall exactly — 144 inches, no filler. Every standard base, wall and tall cabinet size, with a calculator for your wall.
Open calculator → ConstructionToilet Size Chart: Standard Dimensions & Clearances 2026
An elongated toilet needs a 30-by-51-inch space — 15 inches from the centerline each side and 21 inches clear in front. Every standard toilet size, with a fit checker for your bathroom.
Open calculator → ConstructionSink Size Chart: Standard Kitchen & Bathroom Sizes 2026
A 30-inch kitchen single bowl needs a 34-by-25-inch counter — 2 inches each side and 3 behind for the faucet. Every standard sink size, with a fit checker for your counter.
Open calculator →ConstructionChain Size Chart: ANSI Roller Chain Sizes & Pitch 2026
ANSI sizes #25 to #200 — pitch, roller diameter, width and minimum tensile strength, plus a chain-length calculator: 100 links of #40 chain is 50.00 inches.
Open calculator →ConstructionFuse Size Chart: Amps, Wire Gauge & Max Watts 2026
Standard fuse sizes 15–60 A with wire gauge and max watts — a 1,500 W heater at 120 V needs 15.63 A, so a 20 A fuse on 12 AWG. Find your size and the 125% rule.
Open calculator → ConstructionDumpster Size Chart: 10, 20, 30 & 40 Yard Guide 2026
A 15-cubic-yard debris pile needs a 20-yard dumpster — 5 pickup loads, 4,500 lb. Every standard roll-off size, with a fit checker for your debris volume.
Open calculator →ConstructionGarage Size Chart: 1, 2, 3 & 4 Car Dimensions 2026
Standard garage sizes for 1–4 cars, 240–800 sq ft — a 2-car garage is 20 × 20 ft, 400 sq ft, with a 16 ft door. Add storage and find your footprint.
Open calculator → ConstructionShed Size Chart: Standard Dimensions & Fit Guide 2026
A 10×12 ft shed needs a 14×16 ft footprint in a 30×20 ft yard. Standard sizes from 4×6 ft to 12×24 ft, with a fit checker for your yard.
Open calculator → ConstructionCloset Size Chart: Standard Dimensions & Fit Guide 2026
A walk-in medium 7×10 ft closet needs a 7×12 ft footprint in a 14×12 ft space — it fits exactly. Standard sizes from 4 ft reach-ins to 10×12 ft walk-ins, with a fit checker for your space.
Open calculator → ConstructionDesk Size Chart: Standard Dimensions & Fit Guide 2026
A computer desk 60×30 in needs a 7×5.5 ft footprint in a 10×8 ft room — it fits.
Open calculator → ConstructionFence Size Chart: Panels, Posts & Cost Per Foot 2026
100 ft of 6-ft wood privacy fence needs 13 panels, 14 posts and costs $4,500.
Open calculator → ConstructionCrushed Stone Calculator: Cubic Yards, Tons & Bags 2026
Cubic yards, tons, and 50-lb bags for any area — 40.00 cu ft, 1.48 cu yd, 2.00 tons for a 10 × 12 ft area at 4 in deep.
Open calculator → ConstructionCountertop Size Chart: Dimensions, Cost & Weight 2026
A 10 ft quartz run is 22.08 sq ft — $2,870.83, 397.50 lb, 1 slab.
Open calculator →ConstructionBolt Length Chart: Pick the Right Bolt Length for the Job
A 2-inch bolt is 50.80 mm — the standard general-purpose length. Check bolt lengths from 0.5 to 6 inches, in inches and millimeters, by class. Free to use.
Open chart →ConstructionDrywall Screw Size Chart: Pick the Right Length & Gauge
1/2 in drywall takes a 1-1/4 in #6 screw (31.75 mm). Find the right drywall screw length and gauge for every drywall thickness, single and double layer. Free.
Open chart →ConstructionFurnace Size Chart: BTU by Home Size & Climate Zone
A 2,000 sq ft home in the cold zone needs 90,000-110,000 BTU — a 100,000 BTU furnace. Find your furnace size by home size and climate zone, in seconds. Free.
Open chart →ConstructionLumber Span Chart: Max Floor Joist Span by Size & Species
A 2x10 Douglas fir-larch No.2 joist at 16 in spans 15 ft 7 in. Look up the max floor joist span by size, species, grade and spacing — IRC Table R502.3.1(2). Free.
Open chart →ConstructionGrout Quantity Chart: Sq Ft per 25-lb Bag by Tile & Joint
A 12×12 in tile with a 1/4 in joint covers 177 sq ft per 25-lb bag of Polyblend Plus grout — 100 sq ft needs 1 bag. Look up any tile size and joint width. Free.
Open chart →ConstructionTile Grout Chart: Joint Width by Tile Size (mm & in)
A 12×24 in tile takes a 1/4 in (6.35 mm) grout joint. Find the grout joint width for every tile size, from mosaic to 24×48 in, in inches and mm. Free.
Open chart →ConstructionSiding Coverage Chart: Squares, Panels & Boxes by Profile
A 1,500 sq ft wall in Double 4 vinyl needs 15.00 squares, 198 panels and 9 cartons at 10% waste.
Open calculator →ConstructionFlooring Coverage Chart: Boxes by Room Size & Waste
A 400 sq ft room at 10% waste needs 440 sq ft of flooring — 22 boxes at 20 sq ft per box.
Open calculator →ConstructionDeck Board Chart: Boards Needed by Deck Size & Waste
A 200 sq ft deck with 5.5 in boards in 12 ft lengths needs 40 boards with 10% waste, 480.00 ft to buy.
Open calculator →ConstructionRoofing Shingle Chart: Bundles by Roof Size & Waste
A 2,000 sq ft roof needs 20 squares and 60 bundles, 66 with 10% waste, plus 6 underlayment rolls.
Open calculator →ConstructionFence Post Depth Chart: Height, Frost & Concrete Bags
A 6 ft fence in 24 inches of frost needs posts 24 inches deep — 1 bag of concrete per post.
Open calculator →ConstructionGravel Depth Chart: Yards, Tons & Coverage by Area
200 square feet at 4 inches deep needs 2.47 cubic yards (3.46 tons) — order 3 cubic yards.
Open calculator →ConstructionSand Coverage Chart: Yards, Tons & Coverage by Area
100 square feet at 2 inches deep needs 0.62 cubic yards (0.93 tons) of sand — order 1 cubic yard.
Open calculator →ConstructionFence Board Chart: Pickets Needed by Length & Width
A 100-foot fence with 6-inch pickets needs 200 pickets.
Open calculator →ConstructionTopsoil Coverage Chart: Cubic Yards & Tons by Area & Depth
100 sq ft at 3 inches needs 0.93 cubic yards of topsoil, 1.25 tons — order 1 yard.
Open calculator →ConstructionRoofing Underlayment Chart: 6 Rolls for 2,000 Sq Ft
2,000 sq ft at 10% waste needs 5.50 rolls of underlayment at 400 sq ft a roll — order 6 rolls.
Open calculator →ConstructionSod Coverage Chart: 110 Rolls & 3 Pallets for 1,000 Sq Ft
1,000 sq ft at 10% waste needs 110.00 sod rolls at 10 sq ft a roll — order 110 rolls on 3 pallets.
Open calculator →ConstructionWallpaper Coverage Chart: 9 Rolls for 400 Sq Ft Walls
A 400 sq ft wall at 10% waste needs 8.80 wallpaper rolls at 50 sq ft a roll — order 9 rolls.
Open calculator →ConstructionPlywood Sheet Chart: 14 Sheets for a 400 Sq Ft Area
A 400 sq ft area at 10% waste needs 13.75 plywood sheets at 32 sq ft a sheet — order 14 sheets.
Open calculator → ConstructionMortar Coverage Chart: 8 Bags for 400 Sq Ft at 10% Waste
400 sq ft at 10% waste with 60 sq ft per bag needs 7.33 bags exact — order 8. Plus a 16-row lookup table.
Open chart → ConstructionBacker Board Chart: 30 Sheets for 400 Sq Ft at 10% Waste
400 sq ft at 10% waste with 15 sq ft per sheet needs 29.33 sheets exact — order 30. Plus a 16-row lookup table.
Open chart → ConstructionUnderlayment Chart: 14 Sheets for 400 Sq Ft at 10% Waste
400 sq ft at 10% waste with 32 sq ft per sheet needs 13.75 sheets exact — order 14. Plus a 16-row lookup table.
Open chart → ConstructionThinset Chart: 9 Bags for 400 Sq Ft at 10% Waste
400 sq ft at 10% waste with 50 sq ft per bag needs 8.80 bags exact — order 9. Plus a 16-row lookup table.
Open chart → ConstructionGrout Sealer Chart: 3 Bottles for 400 Sq Ft at 10% Waste
400 sq ft at 10% waste with 200 sq ft per bottle needs 2.20 bottles exact — order 3. Plus a 16-row lookup table.
Open chart → ConstructionTile Adhesive Chart: 11 Bags for 400 Sq Ft at 10% Waste
400 sq ft at 10% waste with 40 sq ft per bag needs 11.00 bags exact — order 11. Plus a 16-row lookup table.
Open chart → ConstructionFloor Leveler Chart: 18 Bags for 400 Sq Ft at 10% Waste
400 sq ft at 10% waste with 25 sq ft per bag needs 17.60 bags exact — order 18. Plus a 16-row lookup table.
Open chart → ConstructionPlaster Coverage Chart: 6 Bags for 400 Sq Ft at 10% Waste
400 sq ft at 10% waste with 80 sq ft per bag needs 5.50 bags exact — order 6. Plus a 16-row lookup table.
Open chart → ConstructionJoint Compound Chart: 5 Gallons for 400 Sq Ft at 10% Waste
400 sq ft at 10% waste with 100 sq ft per gallon needs 4.40 gallons exact — order 5. Plus a 16-row lookup table.
Open chart → ConstructionStucco Coverage Chart: 5 Bags for 400 Sq Ft, 10% Waste
400 sq ft at 10% waste with 90 sq ft per bag needs 4.89 bags exact — order 5. Plus a 16-row lookup table.
Open chart → ConstructionSiding Coverage Chart: 3 Boxes for 400 Sq Ft, 10% Waste
400 sq ft at 10% waste with 200 sq ft per box needs 2.20 boxes exact — order 3. Plus a 16-row lookup table.
Open chart → ConstructionStain Coverage Chart: 2 Gallons for 400 Sq Ft at 10% Waste
400 sq ft at 10% waste with 250 sq ft per gallon needs 1.76 gallons exact — order 2. Plus a 16-row lookup table.
Open chart → ConstructionGrout Coverage Chart: 9 Bags for 400 Sq Ft at 10% Waste
400 sq ft at 10% waste with 50 sq ft per bag needs 8.80 bags exact — order 9. Plus a 16-row lookup table.
Open chart → ConstructionPrimer Chart: 2 Gallons for 400 Sq Ft at 10% Waste
400 sq ft at 10% waste with 300 sq ft per gallon needs 1.47 gallons exact — order 2. Plus a 16-row lookup table.
Open chart → ConstructionCaulk Chart: 4 Tubes for 100 Feet at 1/4-Inch Bead
100 linear feet at 30 feet per tube needs 3.33 tubes exact — order 4. Plus a 16-row lookup table.
Open chart → ConstructionPaint Coverage Chart: 2 Gallons for a 400 Sq Ft Room
400 sq ft at 10% waste with 350 sq ft per gallon needs 1.26 gallons exact — order 2. Plus a 16-row lookup table.
Open chart → ConstructionDrywall Sheet Chart: 14 Sheets for a 400 Sq Ft Area
400 sq ft at 10% waste with 32 sq ft sheets needs 13.75 sheets exact — order 14. Plus a 16-row lookup table.
Open chart → ConstructionInsulation Roll Chart: 11 Rolls for a 400 Sq Ft Area
400 sq ft at 10% waste with 40 sq ft rolls needs 11.00 rolls exact — order 11. Plus a 16-row lookup table.
Open chart →ConstructionCement Bag Chart: 82 Bags for a 100 Sq Ft Slab at 4 In
A 100 sq ft slab at 4 inches deep and 10% waste needs 81.48 cement bags at 0.45 cu ft a bag — order 82 bags.
Open calculator →ConstructionStone Coverage Chart: 1.38 Tons for 100 Sq Ft at 3 In
A 100 sq ft area at 3 inches deep and 10% waste needs 27.50 cu ft of stone: 1.02 cu yd at 1.35 tons per cu yd is 1.38 tons — order 1.5 tons.
Open calculator →ConstructionBrick Chart: 770 Bricks for 100 Sq Ft at 7 per Sq Ft
A 100 sq ft wall at 7 bricks per sq ft needs 700 bricks: 770 with 10% waste — order 2 pallets.
Open calculator →ConstructionTile Chart: 440 Tiles for 100 Sq Ft at 4 per Sq Ft
A 100 sq ft floor at 4 tiles per sq ft needs 400 tiles: 440 with 10% waste — order 22 boxes of 20.
Open calculator →ConstructionLaminate Chart: 11 Boxes for 200 Sq Ft at 10% Waste
A 200 sq ft floor at 20 sq ft per box needs 220.00 sq ft with 10% waste — order 11 boxes.
Open calculator →ConstructionHardwood Chart: 14 Boxes for 250 Sq Ft at 10% Waste
A 250 sq ft floor at 20 sq ft per box needs 275.00 sq ft with 10% waste — order 14 boxes.
Open calculator →ConstructionInsulation Chart: 7 Bags for 400 Sq Ft at 10% Waste
400 square feet at 10% waste with 64 square feet per bag is 6.88 bags exact — order 7, free.
Open calculator →ConstructionLawn Seed Coverage Chart: 30 Lb of Seed, Order 2 Bags
5,000 square feet at 6 lb per 1,000 square feet is 30.00 lb of seed — 1.20 bags exact, order 2, free.
Open calculator → ConstructionTopsoil Chart: 5 Cubic Yards for 400 Sq Ft at 10% Waste
400 sq ft at 10% waste with 108 sq ft per cubic yard needs 4.07 cubic yards exact — order 5. Plus a 16-row lookup table.
Open chart → ConstructionGravel Chart: 3 Cubic Yards for 400 Sq Ft at 10% Waste
400 sq ft at 10% waste with 162 sq ft per cubic yard needs 2.72 cubic yards exact — order 3. Plus a 16-row lookup table.
Open chart → ConstructionPea Gravel Chart: 4 Cubic Yards for 300 Sq Ft at 3 Inches
300 sq ft at 3-inch depth with 10% waste needs 330.00 sq ft — 3.06 cubic yards exact, order 4. Plus a 16-row lookup table.
Open chart → ConstructionSand Chart: 2 Cubic Yards for 400 Sq Ft at 1 Inch Depth
400 sq ft at 1-inch depth and 10% waste needs 1.36 cubic yards exact — order 2. Plus a 16-row lookup table.
Open chart → ConstructionCrushed Stone Chart: 3 Cubic Yards for 400 Sq Ft at 2 Inches
400 sq ft at 2-inch depth and 10% waste needs 2.72 cubic yards exact — order 3. Plus a 16-row lookup table.
Open chart → ConstructionRiver Rock Chart: 3 Cubic Yards for 400 Sq Ft at 2 Inches
400 sq ft at 2-inch depth and 10% waste needs 2.72 cubic yards exact — order 3. Plus a 16-row lookup table.
Open chart →ConstructionLimestone Chart: 3 Cubic Yards for 400 Sq Ft at 2 Inches
400 sq ft at 2-inch depth and 10% waste needs 2.72 cubic yards exact — order 3. Plus a 16-row lookup table.
Open chart →ConstructionSlate Chip Chart: 5 Cubic Yards for 400 Sq Ft at 3 Inches
400 sq ft at 3-inch depth and 10% waste needs 4.07 cubic yards exact — order 5. Plus a 16-row lookup table.
Open chart → ConstructionGranite Chip Chart: 4 Cubic Yards for 500 Sq Ft at 2 Inches
500 sq ft at 2-inch depth with 10% waste needs 550.00 sq ft — 3.40 cubic yards exact, order 4. Plus a 16-row lookup table.
Open chart → ConstructionBasalt Chip Chart: 6 Cubic Yards for 500 Sq Ft at 3 Inches
500 sq ft at 3-inch depth with 10% waste needs 550.00 sq ft — 5.09 cubic yards exact, order 6. Plus a 16-row lookup table.
Open chart → ConstructionMarble Chip Chart: 5 Cubic Yards for 600 Sq Ft at 2 Inches
600 sq ft at 2-inch depth with 10% waste needs 660.00 sq ft — 4.07 cubic yards exact, order 5. Plus a 16-row lookup table.
Open chart → ConstructionSandstone Chip Chart: 6 Cubic Yards, 400 Sq Ft at 4 Inches
400 sq ft at 4-inch depth with 10% waste needs 440.00 sq ft — 5.43 cubic yards exact, order 6. Plus a 16-row lookup table.
Open chart → ConstructionQuartzite Chip Chart: 7 Cubic Yards, 500 Sq Ft at 4 Inches
500 sq ft at 4-inch depth with 10% waste needs 550.00 sq ft — 6.79 cubic yards exact, order 7. Plus a 16-row lookup table.
Open chart → ConstructionTravertine Chip Chart: 7 Cubic Yards, 600 Sq Ft at 3 Inches
600 sq ft at 3-inch depth with 10% waste needs 660.00 sq ft — 6.11 cubic yards exact, order 7. Plus a 16-row lookup table.
Open chart → ConstructionBluestone Chip Chart: 5 Cubic Yards, 700 Sq Ft at 2 Inches
700 sq ft at 2-inch depth with 10% waste needs 770.00 sq ft — 4.75 cubic yards exact, order 5. Plus a 16-row lookup table.
Open chart → ConstructionLimestone Chip Chart: 6 Cubic Yards, 800 Sq Ft at 2 Inches
800 sq ft at 2-inch depth with 10% waste needs 880.00 sq ft — 5.43 cubic yards exact, order 6. Plus a 16-row lookup table.
Open chart → ConstructionFlagstone Chip Chart: 10 Cubic Yards, 900 Sq Ft at 3 Inches
900 sq ft at 3-inch depth with 10% waste needs 990.00 sq ft — 9.17 cubic yards exact, order 10. Plus a 16-row lookup table.
Open chart → ConstructionRiver Rock Chip Chart: 14 Yards, 1000 Sq Ft at 4 Inches
1000 sq ft at 4-inch depth with 10% waste needs 1100.00 sq ft — 13.58 cubic yards exact, order 14. Plus a 16-row lookup table.
Open chart → ConstructionPebble Chip Chart: Order 8 Yards, 700 Sq Ft at 3 Inches
700 sq ft at 3-inch depth with 10% waste needs 770.00 sq ft — 7.13 cubic yards exact, order 8. Plus a 16-row lookup table.
Open chart → ConstructionCobblestone Chip Chart: Order 9 Yards, 850 Sq Ft at 3 Inches
850 sq ft at 3-inch depth with 10% waste needs 935.00 sq ft — 8.66 cubic yards exact, order 9. Plus a 16-row lookup table.
Open chart → ConstructionLava Rock Chip Chart: Order 13 Yards, 950 Sq Ft at 4 Inches
950 sq ft at 4-inch depth with 10% waste needs 1,045.00 sq ft — 12.90 cubic yards exact, order 13. Plus a 16-row lookup table.
Open chart → ConstructionBrick Chip Chart: Order 9 Yards, 800 Sq Ft at 3 Inches
800 sq ft at 3-inch depth with 10% waste needs 880.00 sq ft — 8.15 cubic yards exact, order 9. Plus a 16-row lookup table.
Open chart → ConstructionQuartz Chip Chart: Order 10 Yards, 900 Sq Ft at 3 Inches
900 sq ft at 3-inch depth with 10% waste needs 990.00 sq ft — 9.17 cubic yards exact, order 10. Plus a 16-row lookup table.
Open chart → ConstructionCrushed Glass Chip Chart: Order 8 Yards, 750 Sq Ft at 3 Inches
750 sq ft at 3-inch depth with 10% waste needs 825.00 sq ft — 7.64 cubic yards exact, order 8. Plus a 16-row lookup table.
Open chart → ConstructionVolcanic Rock Chip Chart: 650 Sq Ft, 3 Inches, 7 Yards
650 sq ft at 3-inch depth with 10% waste needs 715.00 sq ft — 6.62 cubic yards exact, order 7. Plus a 16-row lookup table.
Open chart → ConstructionPea Gravel Chip Chart: 700 Sq Ft, 3 Inches, 8 Yards
700 sq ft at 3-inch depth with 10% waste needs 770.00 sq ft — 7.13 cubic yards exact, order 8. Plus a 16-row lookup table.
Open chart → ConstructionDecomposed Granite Chip Chart: 800 Sq Ft, 3 Inches, 9 Yards
800 sq ft at 3-inch depth with 10% waste needs 880.00 sq ft — 8.15 cubic yards exact, order 9. Plus a 16-row lookup table.
Open chart → ConstructionRed Rock Chip Chart: 600 Sq Ft, 3 Inches Deep, 7 Yards
600 sq ft at 3-inch depth with 10% waste needs 660.00 sq ft — 6.11 cubic yards exact, order 7. Plus a 16-row lookup table.
Open chart → ConstructionCrushed Stone Chip Chart: 750 Sq Ft, 3 Inches, 8 Yards
750 sq ft at 3-inch depth with 10% waste needs 825.00 sq ft — 7.64 cubic yards exact, order 8. Plus a 16-row lookup table.
Open chart → ConstructionSeashell Chip Chart: 900 Sq Ft, 3 Inches, 10 Yards
900 sq ft at 3-inch depth with 10% waste needs 990.00 sq ft — 9.17 cubic yards exact, order 10. Plus a 16-row lookup table.
Open chart → ConstructionPorcelain Chip Chart: 800 Sq Ft, 4 Inches, 11 Yards
800 sq ft at 4-inch depth with 10% waste needs 880.00 sq ft — 10.86 cubic yards exact, order 11. Plus a 16-row lookup table.
Open chart → ConstructionCoral Chip Chart: 850 Sq Ft, 3 Inches, Order 9 Yards
850 sq ft at 3-inch depth with 10% waste needs 935.00 sq ft — 8.66 cubic yards exact, order 9. Plus a 16-row lookup table.
Open chart → ConstructionTerracotta Chip Chart: 850 Sq Ft, 4 Inches, 12 Yards
850 sq ft at 4-inch depth with 10% waste needs 935.00 sq ft — 11.54 cubic yards exact, order 12. Plus a 16-row lookup table.